Process
A clear process, agreed in writing
Site survey, design, written estimate, construction and handover. You know the scope before work begins.
Free consultation
Five steps
From site survey to handover
Each step builds on the one before. Nothing moves to construction until the written estimate is agreed.

Step 1: Site survey
We visit the location to measure the area and look at access, soil, drainage and existing structures.
The survey is where the brief becomes concrete. We note the space available, the levels, where water and power come from and how materials can reach the site.
Step 2: Design to the site
The pool shape, size, depth and finishes are planned around your land and how you want to use the pool.
If you already have a design from an architect, we work from it. If not, we propose a layout that fits the site and talk it through with you.
Step 3: Written cost estimate
You receive a written estimate that sets out the scope of work before anything is agreed.
Cost and schedule are set at this stage, based on the survey and the agreed design. Work starts only once you have agreed to the written estimate.
Step 4: Construction
Excavation, structure, plumbing, finishes and equipment, carried out neatly and kept to the agreed scope.
Work follows the agreed design and estimate. If something needs to change along the way, it is discussed and agreed with you before it is done.
Step 5: Handover
The finished pool is checked together with you and handed over, ready for use.
Handover is the moment to go through the finished work and ask questions about day-to-day care. Ongoing maintenance can be arranged separately if you want it.
Written estimate
What the estimate sets out
The estimate is prepared after the survey and design, so it reflects your site and your pool.
What will be built, renovated or serviced, based on the agreed design.
Scope of work
The cost of the agreed scope, set out before you decide.
Cost
When work can start and the planned order of the main stages.
Schedule
How changes to the scope are discussed and agreed with you along the way.
Changes
FAQs
Process questions
About consultations, timing, designs and where we work.
Is the first consultation free?
Yes. You can describe your plans on WhatsApp or through the consultation form at no cost, and we will arrange the next step with you.
When are the cost and schedule decided?
Both are set after the site survey, in a written estimate. Work starts once you have agreed to that estimate.
What affects how long a pool project takes?
Size, depth, site access, soil conditions, the chosen finishes and the weather all play a part. The schedule for your project is included in the written estimate.
Can I use my own architect's design?
Yes. Share the drawings with us and we will review them on site and plan the work from them.
Which areas do you cover?
We are based in Sibang Gede, Badung, and our recent projects include Seseh and Sanur. Send us your location and we will confirm whether we can survey it.